New pool
A north-woods fiberglass pool — priced honestly after we see the lot.
Fiberglass only. High-end installs for Hayward-area lake homes and inland lots. Contact first; sketch drivers if you want a feel for what moves the range.
Buyer guide · lite
Wisconsin freeze–thaw favors a one-piece shell. Most Sawyer County yards are “typical” or “difficult” access — that’s normal. Heaters, covers, and salt systems matter for season length and care; we fold them into the conversation as options on your shell, not a separate shop.
Typical north-woods high-end projects land mid–high six figures all-in — we’ll give a real range after we see the lot. No public dollar tables; no fake starting prices.
Start a conversation
Name, lake or town, and whether this season is the goal. That’s enough for a useful first reply.
Or sketch a rough range first (drivers only).
Budget drivers
What moves the range — not a quote.
Pick shell size, border, features, and landscape. We show your selections only. Typical north-woods high-end projects land mid–high six figures all-in — we’ll give a real range after we see the lot.
Heaters, covers, and salt systems are discussed as part of your new-pool design — never as a standalone storefront. We’ll size them to your shell, lot, and how long you want the season to run.
Straight talk
What’s included — and how payment usually stages.
Clear scope beats mystery bids. Exact schedule depends on your contract; this is the pattern we talk through early.
Typically included
- Fiberglass shell selected for your lot and lifestyle
- Excavation, set, and backfill suited to northern soils
- Essential equipment package sized to the shell
- Agreed patio / 3′ border scope
- Startup walkthrough and care guidance
Usually separate or optional
- Expanded hardscape beyond the agreed border
- Landscape packages beyond essential finish
- Heater, automatic cover, salt / advanced sanitation
- Water features, lighting upgrades, fencing
- Shoreland, engineering, or rock extras when the lot demands them
Payment stages (optional pattern)
-
1
Design deposit Locks planning and shell lead time conversation.
-
2
Pre-dig / shell commitment Before excavation and shell delivery windows.
-
3
Set & deck progress Tied to milestones on site — not vague retainers.
-
4
Final at walkthrough After punch list and startup.